SANKO ENERJİ

Other

SANKO ENERJİ

About the Project

SANKO ENERJİ

VRV Maintenance, Repair and Installation in the Administrative Buildings of a Wind Turbine Power Plant

Expert Climate-Control Service at a Renewable Energy Facility

Maintenance, repair and installation services for the VRV systems installed in the administrative and technical operation buildings of the wind-turbine power plants within Sanko Enerji are provided successfully. Since wind farms are generally located in high and remote geographies, they require far more planning and operational flexibility than a standard urban project in terms of site-access logistics, climate conditions and spare-part lead times.

For VRV system maintenance, mobilization is planned carefully so as to reach the plant sites on time and with a full team; the spare parts that may be needed during the maintenance process are prepared in advance. The air conditioning module of the building management system, which operates in integration with SCADA automation systems, is also included within the comprehensive technical inspection.

In the technical services provided to the renewable energy sector, reliability and adherence to schedule come above all else. The remoteness of the plant management leaves no room for even the slightest tolerance in service quality.

In the installation projects, equipment resistant to site conditions and with a wide operating-temperature range was chosen; installations were completed so as to provide protection against high wind and humidity conditions. This reference proves that our technical expertise holds up even in the most challenging field conditions.

Project Details
Project Type Other
System Type VRV Maintenance, Repair and Installation in the Administrative Buildings of a Wind Turbine Power Plant

Planning a Similar Project?

Our expert team will assess your project requirements for free and recommend the most suitable air conditioning solution.